Vape Coil TPD playbook
We ship vape coils to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.
Published 03 January 2026 · VapeWholesaleHub · Reading time 9 min
Shipping without surprises
If you are comparing three quotes for vape coil, compare the paperwork first. Test reports, artwork files, batch coding and the replacement clause tell you more about a supplier than the unit price on page one.
For repeat buyers we hold a shipping schedule rather than shipping on request. A fixed weekly cut-off means your reorder lands before the shelf empties instead of after.
If you dropship, we can label cartons to your format and omit our documentation from the outer box. It is a small operational detail that decides whether your customer sees a supplier or a partner.
Sell-through notes for the shop floor
Seasonality in vape coils is real but smaller than most buyers assume. The bigger swing comes from restocking discipline, not from calendar events.
Counter space is finite. Three well-chosen SKUs outsell nine crowded ones, and the empty space signals a curated range rather than a clearance table.
Support that answers the question
The replacement policy is deliberately simple: report within seven days of delivery with photos and the batch code, and we replace or credit at the next shipment. We do not argue about a defect we can see in a photograph.
We keep the specification sheet for every order on file. Two years later, when a customer asks whether a pod is compatible, the answer is a lookup rather than a guess.
- Cartons drop-tested and pallet-counted for clean freight
- Standing reorder schedule with a fixed cut-off
- Mixed SKU cartons to spread first-order risk
- Consolidated or split shipping, quoted both ways
- Document pack prepared per destination market
- Specification locked in writing before production starts
Building an assortment that actually turns
When you compare suppliers for vape coil, ask for the last three production dates on the same SKU. If the answers are vague, the specification is not being held and the next batch will not match the sample you approved.
Factory capacity matters more than factory size. A line that can hold a tolerance across 5,000 units is worth more than a showroom that can produce 50,000 on paper. We qualify capacity by running a repeat order and measuring the drift.
Specification summary
| Resistance | 0.15 ohm |
| Build | Mesh |
| Wicking | Cotton bacon |
| Fitment | Magnetic |
| Pack size | 3 per pack |
| Compatibility | Universal deck |
| Minimum order | 300 units per SKU, mixed cartons allowed |
| Lead time | 30 working days after artwork approval |
The detail above is what we hold ourselves to on every shipment, including the small ones. It is also the list we will walk through with you before the first order.
Frequently asked
How long does production take?
Around 22 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
Related reading
Need a quotation on vape coils?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz